Lithia Springs Resort, Ashland, Oregon Design Team Leadership, Planning Entitlements including Flood Plain Studies and CM/GC to construct:
- Two Parking lot expansions of 10 and 25 spaces.
- Water Treatment improvement and two capacity expansions: 2- 800 gallon plastic tanks and one 2,000 Gal.Concrete tank.
- Significant utility relocation to accommodate new pool facility
- Installation of two - 2,000 gallon Irrigation tanks and installation of groundwater collection system for supply.
- Installation of 1100 LF of water supply lines from a remote well location.
Duane Smith & BDN, LLC $325k 2014 ongoing